KitLog pro

Powered By Kitlog Pro v2.0

Marks Web Site
' style=
Date:  8-25-2009
Number of Hours:  8.50
Manual Reference:  6-x
Brief Description:  Tail fairing retaining screw anchor nuts...

After having removed the empanage and empanage fairing I drilled to final size and countersunk the holes for the lower fairing retaining screws. Then I drilled for anchor nuts, countersunk for rivet holes and installed the anchor nuts. Following this I applied form-a-gasket material on the fuselage forward upper skin access panel cut outs and installed the panels with some wax paper so the form-a-gasket would not stick to the access panels. Lastly I adjusted the temporary fuselage legs for some extra height for the cowling installation.
' style=

Horizontal to vertical stab fairing retaining screw anchor nuts installed

Horizontal to vertical stab fairing retaining screw anchor nuts installed

' style=

Forward upper fuselage deck access panel form-a-gasket applied

Forward upper fuselage deck access panel form-a-gasket applied

' style=

Fuselage temporary support legs raised for cowling installation

Fuselage temporary support legs raised for cowling installation

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.